Check Lists:Project Management/Test

From PMISwiki
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Test

Below you will find check-lists for preparation of Test documentation.

Test Plan

  • What will be tested.
  • What requirements will be verified (Reference to Requirement specification or even better to the Requirement traceability matrix).
  • Definition of Measurement methods or Standards.
  • Entry criteria for each test.
  • Definition of acceptance criteria (Test item level and globally).
  • The customer's participation.
  • Consequences if test in question is approved/not approved.

Test Procedure

  • Test prerequisites
  • Step by step script
  • Accept criteria

Test Report

  • List of participants (Check-in/Check-out)
  • Documentation of executed tests and their results (Failed/Passed).

Milestone Acceptance Criteria

It is very important that the Accept Criteria are described and agreed in good time before the milestone.

  • References to named tests.
  • Other prerequisites.

References

Document History

Version Date Author Status Purpose of update
1 17 Mar 2012 PSA Draft Not released.